Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eocgo/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the soledad domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eocgo/public_html/wp-includes/functions.php on line 6114
VALIDATION OF GENDER AND EQUITY ASSESSMENT TOOLS FOR BFPS AND MPS TO ENHANCE THE FULFILLMENT OF THE PFM ACT 2015 AT FAIRWAY HOTEL ON WEDNESDAY 12TH JULY, 2017 – EQUAL OPPORTUNITIES COMMISSION
Home BFP VALIDATION OF GENDER AND EQUITY ASSESSMENT TOOLS FOR BFPS AND MPS TO ENHANCE THE FULFILLMENT OF THE PFM ACT 2015 AT FAIRWAY HOTEL ON WEDNESDAY 12TH JULY, 2017

VALIDATION OF GENDER AND EQUITY ASSESSMENT TOOLS FOR BFPS AND MPS TO ENHANCE THE FULFILLMENT OF THE PFM ACT 2015 AT FAIRWAY HOTEL ON WEDNESDAY 12TH JULY, 2017

by Kevin

The validation of the draft assessment tools and Gender and Equity workshop was held at Fairway Hotel on Wednesday 12th July, 2017. It was attended by representatives from different agencies which included UK AID, EOC, MoFPED, SURGE and other MDAs

Remarks were made by Mubarak Mabuya from SURGE, Julius Kamya representing the Secretary EOC and Sylvia Muwebwa Ntambi (Mrs), Chairperson EOC.

Discussions included sector challenges, observations and amendments of the current BFPs and MPS

Participants engaged in Capacity enhancement between MDA’s, formed working groups and presented ways forward based on their discussions.

Recommendations

  1. BFP Assessment tool sub section numbering should correspond with structure of the BFP.
  2. Past performance and medium-term plans should correspond with BFP section 2.
  3. Clarify assessor roles.
  4. MPS should correspond numbering.
  5. Propose modifications to assessment tool for defined sources and sub-section.
  6. Identify additional source of information required for example Gender and Equity specific, budget utilization.

Presentation from Mr. Mubarak Mabuya from SURGE